The tunnel leading to the SECC was designed by the Scottish firm James Parr and Partners and built by the Bovis Construction. The principal architect was Vincent Hamilton and the construction contract was 26 months. The total cost of the project (not adjusted for inflation) was £20,532,000 + £9,105,380 in site works and design fees).